Cleme seria grea Polipropilenă green 07841-01-2019011
- For the secure fastening pipelines
- With smooth inner face
- compressing
- Recommended for hoses and cables
- With rounded edges
Unitatea de vânzare
€6.34
plus TVA.
Adăugat la coșul de cumpărături
Denumire
Cleme
Varianta 1
seria grea
DIN
DIN 3015-2
Formă
B
Tipul de formă
suprafață interioară netedă
Materialul
corpului de bază
Polipropilenă
Culoarea
corpului de bază
verde
B=lățime
30,5
H=înălțime
46,5
L=lungime
70
A
(metri)
1,2
Cuplu de strângere
(polipropilenă)
(Nm)
12
D
pentru șurub
M10
D1
(inci)
3/4
D1
(mm)
19
Dimensiune
2
L1
45
~ CONFLICT MINERALS 3TG status
no intentional 3TG
~ CP65 substance 2 cancer
soots, tars, and mineral oils
~ PFAS free?
yes
~ REACH SVHC-free?
yes
~ RoHS conformity
yes, without exemption
~ TSCA 6(H) conformity
yes
Descriere
Material
Polypropylene PP.
Version
Green
Note
Clamp fittings DIN 3015-2 heavy duty series, with smooth inner face, non-compressing. Recommended for securely fastening hoses and cables. Smooth inner surfaces and outlet radii prevent damage to hoses and cables.
Preferably used as a floating clamp where the line is not compressed between the clamp halves. Select a clamp with diameter (D1) that is slightly larger than the diameter of the pipe to be secured.
The upper and lower clamp halves are identical. Supplied in pairs.
Preferably used as a floating clamp where the line is not compressed between the clamp halves. Select a clamp with diameter (D1) that is slightly larger than the diameter of the pipe to be secured.
The upper and lower clamp halves are identical. Supplied in pairs.
Technical Data
The specified screw tightening torques refer to installation with a cover plate and DIN EN ISO 4014/4017 hex head screws.
Temperature range
-30 °C to +90 °C
Assembly
The recommended clamp spacings (A) are guidelines and apply to static loads.
Pipe bends: When installing pipe bends, the clamps must be placed directly in front of and behind the bend.
Fittings: The first clamp should be mounted immediately after the fitting to isolate the fitting from vibrations.
Valves: If valves are integrated into the pipeline, a clamp should be fitted in front of and behind the valve.
Pipe bends: When installing pipe bends, the clamps must be placed directly in front of and behind the bend.
Fittings: The first clamp should be mounted immediately after the fitting to isolate the fitting from vibrations.
Valves: If valves are integrated into the pipeline, a clamp should be fitted in front of and behind the valve.
Notă importantă privind descărcarea modelelor CAD
Pentru a descărca modelele noastre CAD, trebuie mai întâi să vă autentificați. Dacă nu v-ați creat încă un cont, vă rugăm să vă înregistrați la rubrica "Contul meu" (partea dreaptă a ecranului) și să urmați instrucțiunile.